(206) 319-5155Licensed, Bonded, and InsuredWA L&I #GMCONCL803K8

Paying for the work

Payment and financing

How money moves on a GM Contracting project — written into your proposal before anything starts, not explained afterwards.

Construction payment disputes almost always come from the same place: nobody wrote the schedule down. So here is how ours works, in plain terms, before you ask.

Deposits and draws

Projects are structured as a deposit, then payments tied to identifiable milestones, then a final payment when the work is complete and you have walked it with us. The deposit covers material that has to be ordered specifically for your job — that is what a deposit is for, and it is normal practice.

What is not normal, from any contractor, is a large share of the total demanded up front, or pressure to pay cash without documentation. Our schedule goes in the written proposal with the amounts and the triggers named. Keep enough unpaid at the end that finishing the punch list is still in everyone’s interest — including with us.

Change orders

Any change to scope or cost is documented and approved by you in writing before the work happens. Not described verbally, not settled on the final invoice. Some changes are genuinely unforeseeable — rot behind siding, an old footing where there should have been soil — and finding one is a reason to stop and talk, not a reason to proceed and bill.

Third-party financing

GM Contracting does not currently offer financing through a lending partner, and we would rather say that plainly than imply otherwise. If paying for a project over time is what makes it possible, the routes homeowners usually look at are a home equity line of credit through their own bank or credit union, an unsecured home improvement loan, or a contractor-arranged plan through a specialist lender.

We have no financial interest in any of those and no referral arrangement, so take this as general information rather than advice — compare the rate and the total cost of borrowing yourself, and be particularly careful with anything offering deferred interest.

What you get in writing

  • Scope of work, materials, and specifically what is excluded
  • The payment schedule with amounts and milestone triggers
  • Expected timeline, including where weather could move concrete work
  • Workmanship warranty terms, and manufacturer warranties on products
  • Our registration number, GMCONCL803K8, and insurance details

If a term is not in the document you signed, treat it as not having been offered — by us or by anybody else bidding your job.

No lending partner

We are not affiliated with any lender and earn nothing from financing. If that changes, this page will say so and name them.

Verify us first

Check the registration before you pay anybody a deposit.

Look up GMCONCL803K8 at the Washington Department of Labor & Industries contractor lookup. Confirm the registration is active, the business name matches your estimate, and the bond and liability insurance are current. Run that check on every contractor you are considering, us included.

Transform your outdoor space. Contact GM Contracting today.

Ready to get started? Call or send the form and we will arrange to walk the site. Estimates are free and they come in writing.

(206) 319-5155Get Free Quote

WA L&I #GMCONCL803K8 · Bonded and insured · Monday–Saturday, 8am–6pm