Two bids for the same patio can differ substantially and both be honest, because they are not bids for the same patio. One includes excavation to depth, compaction in lifts and drainage. The other includes levelling what is there and laying pavers on it. Nothing on either page says that plainly, which is why reading an estimate is a skill worth having.
Why the lowest bid is often the highest
A contractor cannot buy material cheaper than his competitor by any meaningful margin. Labour rates in a market this size do not differ enormously either. So when one bid comes in well under another for nominally identical work, the money came out of somewhere, and there are only a few places it can come from.
Usually it is the part you cannot see. Base depth is the classic one in hardscape, because it is invisible the day the job finishes and it is the single thing that determines whether the patio is still flat in five years. Compaction is another — skipping lifts saves hours and shows up as settling a year later. Drainage is a third, and it is frequently just omitted.
Sometimes the money came out of something more serious: no registration, no bond, no liability insurance, or workers who are not covered. That is not a cheaper version of the same service. It is a transfer of risk onto you, and in Washington an unregistered contractor leaves you with fewer remedies if something goes wrong.
None of which means the higher bid is automatically right. It means price alone cannot tell you anything, and the comparison has to happen on scope.
Read the exclusions first
An estimate's inclusions tell you what the contractor wants you to see. Its exclusions tell you what you are going to be paying for separately, and that is where bids actually differ.
Things that are frequently excluded and frequently expensive:
- Excavation and spoil removal. Digging produces material that has to go somewhere, and hauling it off is a line item. "Customer to remove spoils" means a pile in your yard is now your problem.
- Permits and fees. Someone is paying these. Find out who, and find out whether the contractor is pulling the permit or expecting you to.
- Utility locating. Before anyone digs, underground utilities need marking. In Washington that is a free call to 811 and it is not optional.
- Unknown conditions. Rock, old footings, buried debris, a sprinkler system nobody mapped. Everyone excludes these, reasonably — but ask how they get priced when found.
- Restoration. Access across a lawn leaves ruts. Ask whether putting that right is in the number.
- Specialty trades. Licensed electrical and plumbing connections on an outdoor kitchen. Clarify who holds that scope.
A short estimate with few exclusions is not a generous one. It is usually a vague one, and vagueness resolves in the contractor's favour once work has started.
Verify the registration yourself
Washington requires construction contractors to register with the Department of Labor and Industries, and requires the registration number to appear in advertising. That gives you a free check that takes about a minute, and you should run it on everyone you are considering.
Look up the number at L&I's contractor lookup and confirm four things: that the registration is active, that the business name matches the name on your estimate, that a bond is in place, and that liability insurance is current. The same record shows any infractions or lawsuits on file.
A mismatch between the name on the estimate and the name on the registration is worth stopping over. So is a number that returns an expired or suspended record. Neither is a paperwork technicality — the bond and the insurance are the mechanism by which you have any recourse at all.
Separately, ask for a current certificate of insurance before work starts, naming the coverage and the dates. A contractor who is actually insured produces this without friction. For the record, ours is GM Contracting LLC, registration GMCONCL803K8, and we would rather you verified it than took our word for it.
The change-order conversation
Have this one before you sign, because afterwards it is a dispute rather than a conversation.
Changes on a construction project are normal. Some are yours — you decide mid-project you want the patio bigger. Some are genuinely unforeseeable: rot behind siding that nobody could see, an old footing where the drawings said soil. Neither is evidence of a bad contractor. What matters is the process when one appears.
What you want agreed up front: that any change in scope or cost is documented and approved by you in writing, before the work happens. Not described verbally and settled on the final invoice. The sentence to get into the contract is simple, and a contractor who resists putting it there is telling you something useful.
Ask also how changes get priced — a stated hourly rate and material markup, or a quoted lump sum per change. Either is fine. Not knowing is not.
Questions worth asking
Five that get past sales conversation quickly.
- "What is the base build-up, and how will it be compacted?" On any hardscape. You want specifics — material, depth, compaction in lifts. Vagueness here is the single most predictive bad sign in flatwork.
- "Where does water go?" If there is no clear answer, drainage was not designed, and on a benched or hillside lot that is the main thing that was supposed to be designed.
- "Who is actually on site, and who do I call?" Find out whether the person quoting is the person building, and who answers when there is a question.
- "What is not in this number?" Asked directly. Compare the answers across bids rather than comparing the totals.
- "What is the warranty, and where is it written?" If it is not in the proposal, it does not exist. That holds for us and for everyone else.
And a last one, which tells you more than any of the above: ask what they would not recommend doing on your project. A contractor who has no answer either has not looked at your property closely or is unwilling to talk you out of anything. Both are worth knowing before you sign.
Want someone to look at it?
Free site visit, written estimate, honest answer.
If the right answer is to leave it alone, that is what we will tell you.
WA L&I #GMCONCL803K8 · Bonded and insured
Questions people ask
How do I check a contractor's licence in Washington?
Should I pay a deposit before work starts?
What if the contractor finds something unexpected mid-project?
Read next
Related reading
Concrete & pavers
Pavers, poured concrete, or stamped concrete in Eastern Washington?
A straight comparison for Wenatchee-area driveways and patios — how each one actually fails, which repairs are possible later, and when the cheaper option is genuinely the right call.
Concrete & pavers
Why paver patios heave in a Wenatchee winter
Patios in North Central Washington almost never fail at the surface — they fail underneath. What freeze-thaw actually does to a base, and how to tell whether yours was built to survive it.
Transform your outdoor space. Contact GM Contracting today.
Ready to get started? Call or send the form and we will arrange to walk the site. Estimates are free and they come in writing.
WA L&I #GMCONCL803K8 · Bonded and insured · Monday–Saturday, 8am–8pm